Designing and implementing a new compressor house
Aqua Lorenzo (Albertirsa)Designing and implementing a new compressor house for bottling plant of Aqua Lorenzo. ThermoBox D73 heat protection was even installed.
Problem
Introduction of a new production technology has triggered to install a new compressor at the high-performance production plant. .
Matching the needs of their industry, an oil-free compressor was purchased alongside the installation of distributior Atlas Copco.
However, the enterprise later decided a larger compressor room to build at their site which is one of the largest cutting-edge bottling plants in Europe. We received a call from Aqua Lorenzo who wanted to entrust us with the new room’s design and installation.
Solution
Establishing a new compressor room from scratch
Heat protection and energy efficiency with ThermoBox D73
Result
It’s much easier to establish a new compressor room starting from scratch than converse an existing one. Together with our partner companies, we would say that in the light of experiences gained over many years.
Building a compressor room affords a design where everything could be setting without complications to support the maximum production capacity at the industrial plant.